Kalender
werktage
Count working days between two dates and explain excluded days. See the linked schema for inputs, coverage and limitations.
POST https://kalender.halowerk.com/werktageEingaben
| Feld | Typ | Pflicht | Beschreibung |
|---|---|---|---|
| von | string | Ja | First day of the range, inclusive, format YYYY-MM-DD. |
| bis | string | Ja | Last day of the range, inclusive. |
| land | string | Nein | Country code. |
| region | string | Nein | State code for DE (BW, BY, BE, BB, HB, HH, HE, MV, NI, NW, RP, SL, SN, ST, SH, TH) and AT (B, K, N, O, S, ST, T, V, W), canton code for CH (AG, AI, AR, BE, BL, BS, FR, GE, GL, GR, JU, LU, NE, NW, OW, SG, SH, SO, SZ, TG, TI, UR, VD, VS, ZG, ZH). "DE-BY" works as well. Germany also knows the municipal code BY-AU for the city of Augsburg. Without a region only nationwide holidays are returned. |
| samstag_ist_werktag | boolean | Nein | Count Saturdays as working days. |
| sonntag_ist_werktag | boolean | Nein | |
| zusatzfrei | array | Nein | Own days off on top of the statutory ones, for example company holidays. Either "2026-05-15" or {"datum":"2026-05-15","grund":"Betriebsferien"}. |
Vollständiges Eingabeschema anzeigen
{
"type": "object",
"required": [
"von",
"bis"
],
"properties": {
"von": {
"type": "string",
"format": "date",
"description": "First day of the range, inclusive, format YYYY-MM-DD."
},
"bis": {
"type": "string",
"format": "date",
"description": "Last day of the range, inclusive."
},
"land": {
"type": "string",
"enum": [
"DE",
"AT",
"CH"
],
"default": "DE",
"description": "Country code."
},
"region": {
"type": "string",
"description": "State code for DE (BW, BY, BE, BB, HB, HH, HE, MV, NI, NW, RP, SL, SN, ST, SH, TH) and AT (B, K, N, O, S, ST, T, V, W), canton code for CH (AG, AI, AR, BE, BL, BS, FR, GE, GL, GR, JU, LU, NE, NW, OW, SG, SH, SO, SZ, TG, TI, UR, VD, VS, ZG, ZH). \"DE-BY\" works as well. Germany also knows the municipal code BY-AU for the city of Augsburg. Without a region only nationwide holidays are returned."
},
"samstag_ist_werktag": {
"type": "boolean",
"default": false,
"description": "Count Saturdays as working days."
},
"sonntag_ist_werktag": {
"type": "boolean",
"default": false
},
"zusatzfrei": {
"type": "array",
"maxItems": 100,
"description": "Own days off on top of the statutory ones, for example company holidays. Either \"2026-05-15\" or {\"datum\":\"2026-05-15\",\"grund\":\"Betriebsferien\"}.",
"items": {
"type": [
"string",
"object"
]
}
}
}
}Veröffentlichtes Eingabebeispiel
{
"von": "2026-01-15",
"bis": "2026-01-15",
"land": "DE",
"samstag_ist_werktag": false,
"sonntag_ist_werktag": false
}Ergebnis & Dokumentation
Maschinenlesbare Dokumentation dieses Hubs
Quelle dieser Seite: der veröffentlichte HALOWERK-Katalog. Stand: 2026-11-01, 15:19 UTC.
Weitere Endpunkte dieses Hubs
- Kalender0,001 USDC
feiertage
POSThttps://kalender.halowerk.com/feiertageList public holidays for a year, country and region, including the scope and reason. See the linked schema for inputs, coverage and limitations.
- Kalender0,001 USDC
werktage / rechnen
POSThttps://kalender.halowerk.com/werktage/rechnenAdd or subtract working days from a starting date and report the calculation. See the linked schema for inputs, coverage and limitations.
- Kalender0,001 USDC
zeitzone
POSThttps://kalender.halowerk.com/zeitzoneResolve time-zone information from coordinates or an IANA identifier. See the linked schema for inputs, coverage and limitations.