Rechenwerk
withdrawal deadline
Determines the start event of the 14-day withdrawal period: receipt of the goods, of the last item or partial shipment, or of the first delivery of a subscription (§ 356(2) no. 1 a-d BGB), contract conclusion for services (§ 355(2)) and for utilities and digital content without a medium (§ 356(2) no. 2). The period does not start before proper withdrawal information (§ 356(3)); without it the right expires 12 months and 14 days after the start event (§ 356(4)). Day of the event not counted.
POST https://rechen.halowerk.com/v1/withdrawal-deadlineInputs
| Field | Type | Required | Description |
|---|---|---|---|
| contract_type | string | Yes | goods_single: one delivery; goods_multiple_separate: several goods of one order delivered separately; goods_partial_shipments: one item in parts; goods_regular_delivery: subscription; services; digital_content not on a physical medium; utilities: water, gas, electricity, district heating. |
| contract_date | string | Yes | Date the contract was concluded. |
| deliveries | array | No | Dates on which the consumer (or a named third party, not the carrier) received goods; required for goods types. |
| information_date | string | No | Date proper withdrawal information was received, if later than the start event. |
| informed | boolean | No | false if no proper withdrawal information was ever given (12-month cap applies). |
| state | string | No | German federal state whose public holidays apply (e.g. NW, BY, BE). If omitted, only nationwide holidays are used and states with a different result are listed. |
| region | string | No | Optional sub-region with extra holidays (requires state): BY A=Augsburg, KATH=predominantly Catholic municipalities (Assumption Day), EVANG; SN BZ=Bautzen; TH EIC, UH, WAK. |
Show full input schema
{
"type": "object",
"additionalProperties": false,
"required": [
"contract_type",
"contract_date"
],
"properties": {
"contract_type": {
"type": "string",
"enum": [
"goods_single",
"goods_multiple_separate",
"goods_partial_shipments",
"goods_regular_delivery",
"services",
"digital_content",
"utilities"
],
"description": "goods_single: one delivery; goods_multiple_separate: several goods of one order delivered separately; goods_partial_shipments: one item in parts; goods_regular_delivery: subscription; services; digital_content not on a physical medium; utilities: water, gas, electricity, district heating."
},
"contract_date": {
"type": "string",
"format": "date",
"description": "Date the contract was concluded."
},
"deliveries": {
"type": "array",
"maxItems": 100,
"items": {
"type": "string",
"format": "date"
},
"description": "Dates on which the consumer (or a named third party, not the carrier) received goods; required for goods types."
},
"information_date": {
"type": "string",
"format": "date",
"description": "Date proper withdrawal information was received, if later than the start event."
},
"informed": {
"type": "boolean",
"default": true,
"description": "false if no proper withdrawal information was ever given (12-month cap applies)."
},
"state": {
"type": "string",
"enum": [
"BB",
"BE",
"BW",
"BY",
"HB",
"HE",
"HH",
"MV",
"NI",
"NW",
"RP",
"SH",
"SL",
"SN",
"ST",
"TH"
],
"description": "German federal state whose public holidays apply (e.g. NW, BY, BE). If omitted, only nationwide holidays are used and states with a different result are listed."
},
"region": {
"type": "string",
"enum": [
"A",
"KATH",
"EVANG",
"BZ",
"EIC",
"UH",
"WAK"
],
"description": "Optional sub-region with extra holidays (requires state): BY A=Augsburg, KATH=predominantly Catholic municipalities (Assumption Day), EVANG; SN BZ=Bautzen; TH EIC, UH, WAK."
}
}
}Published input example
{
"contract_type": "goods_partial_shipments",
"contract_date": "2026-04-05",
"deliveries": [
"2026-04-10",
"2026-04-17"
],
"state": "BE"
}Result & documentation
Machine-readable documentation of this hub
Source of this page: the published HALOWERK catalog. Updated: 2026-11-17 UTC.
More endpoints in this hub
- Rechenwerk0.003 USDC
ai act risk class
POSThttps://rechen.halowerk.com/v1/ai-act-risk-classEvaluates the caller’s description against Regulation (EU) 2024/1689 as amended by Regulation (EU) 2026/1744: prohibited practices of Art. 5(1)(a)-(h) and the new points (ba) and (bb) (from 2 December 2026); high-risk under Art. 6(1) (safet
- Rechenwerk0.002 USDC
annuity schedule
POSThttps://rechen.halowerk.com/v1/annuity-scheduleMonthly annuity in arrears as used by German banks: rate = loan × (nominal rate + initial repayment rate) / 12, or from a term via A = L·q^n·(q−1)/(q^n−1) with q = 1 + i/12; interest each month = balance × i/12 (30/360), rounded to cents, t
- Rechenwerk0.002 USDC
appeal deadlines
POSThttps://rechen.halowerk.com/v1/appeal-deadlinesCovers only clearly codified periods: Berufung one month and grounds two months (§§ 517, 520(2) ZPO), Revision one and two months (§§ 548, 551(2) ZPO), labour court appeal (§ 66(1) ArbGG), all starting with service of the complete judgment