Laufwerk
quality / compare mainthread work breakdown
Compare two genuinely distinct public URLs for the actual Lighthouse mainthread-work-breakdown audit, retaining both independent measurements. Compare real mainthread-work-breakdown score, unit-compatible numeric delta and bounded details. Higher score is better; allowed_score_regression defaults0. NotApplicable, unknown or newly applicable is not fabricated as an improvement. Numeric changes are observations, not automatically good/bad. Truncated or redacted equal details remain unknown,.
POST https://lauf.halowerk.com/v1/quality/compare-mainthread-work-breakdownEingaben
| Feld | Typ | Pflicht | Beschreibung |
|---|---|---|---|
| baseline_url | string | Ja | Compare two genuinely distinct public URLs for the actual Lighthouse mainthread-work-breakdown audit, retaining both independent measurements. |
| candidate_url | string | Ja | |
| allowed_score_regression | number | Nein |
Vollständiges Eingabeschema anzeigen
{
"type": "object",
"required": [
"baseline_url",
"candidate_url"
],
"additionalProperties": false,
"properties": {
"baseline_url": {
"type": "string",
"minLength": 10,
"maxLength": 2048,
"pattern": "^https://[^@\\s]+$",
"description": "Compare two genuinely distinct public URLs for the actual Lighthouse mainthread-work-breakdown audit, retaining both independent measurements."
},
"candidate_url": {
"type": "string",
"minLength": 10,
"maxLength": 2048,
"pattern": "^https://[^@\\s]+$"
},
"allowed_score_regression": {
"type": "number",
"minimum": 0,
"maximum": 1,
"default": 0
}
}
}Veröffentlichtes Eingabebeispiel
{
"baseline_url": "https://stack.halowerk.com/_top10-endspurt/product",
"candidate_url": "https://stack.halowerk.com/_top10-endspurt/m2m-browser-fixture",
"allowed_score_regression": 0
}Ergebnis & Dokumentation
Maschinenlesbare Dokumentation dieses Hubs
Quelle dieser Seite: der veröffentlichte HALOWERK-Katalog. Stand: 2026-11-01, 15:19 UTC.
Weitere Endpunkte dieses Hubs
- Laufwerk0,018 USDC
browser evidence
POSThttps://lauf.halowerk.com/v1/browser-evidenceRead-only browser verification complements browser-task: up to four waits, ten DOM existence/text assertions, SHA256 PNG screenshot and up to 200 real request/response observations. Assertions that fail remain a truthful negative result, no
- Laufwerk0,012 USDC
browser task
POSThttps://lauf.halowerk.com/v1/browser-taskLoads one https page in a real headless browser and performs up to eight steps on it: click, fill, select, check, uncheck, wait, wait_for_selector. Returns a per-step log saying what was attempted and whether it succeeded, plus the final UR
- Laufwerk0,016 USDC
browser / absence proof
POSThttps://lauf.halowerk.com/v1/browser/absence-proofProof that a specified unwanted rendered-page element is absent. Exact DOM match count must be zero; does not imply absence of a login wall elsewhere. Actual rendered DOM with SHA256 PNG and redacted per-request evidence. No query/header/bo