Finopswerk
ias28 loss layer allocation
Allocates an IAS28 associate loss and a later profit across three investor interests: ordinary equity, a junior and a senior long-term net-investment interest. Inputs are investor-share amounts. The loss reduces ordinary to zero, then junior, then senior; any excess is suspended. Later profit first absorbs the suspended loss without recognition, then restores senior, junior and ordinary in that order. The caller establishes that both qualify under IAS28.38.
POST https://finops.halowerk.com/v1/ias28-loss-layer-allocationInputs
| Field | Type | Required | Description |
|---|---|---|---|
| ordinary_n | integer | Yes | |
| junior_n | integer | Yes | |
| senior_n | integer | Yes | |
| loss_share_n | integer | Yes | |
| profit_share_n | integer | Yes | |
| amount_denominator | integer | Yes | |
| report | object | Yes |
Show full input schema
{
"type": "object",
"required": [
"ordinary_n",
"junior_n",
"senior_n",
"loss_share_n",
"profit_share_n",
"amount_denominator",
"report"
],
"properties": {
"ordinary_n": {
"type": "integer",
"minimum": 0,
"maximum": 1000000
},
"junior_n": {
"type": "integer",
"minimum": 0,
"maximum": 1000000
},
"senior_n": {
"type": "integer",
"minimum": 0,
"maximum": 1000000
},
"loss_share_n": {
"type": "integer",
"minimum": 0,
"maximum": 1000000
},
"profit_share_n": {
"type": "integer",
"minimum": 0,
"maximum": 1000000
},
"amount_denominator": {
"type": "integer",
"minimum": 1,
"maximum": 1000
},
"report": {
"type": "object",
"minProperties": 18,
"maxProperties": 18,
"propertyNames": {
"enum": [
"ordinary_loss",
"junior_loss",
"senior_loss",
"recognized_loss",
"suspended_loss",
"ordinary_after_loss",
"junior_after_loss",
"senior_after_loss",
"profit_absorbed_suspended",
"senior_recovery",
"junior_recovery",
"ordinary_recovery",
"recognized_profit",
"ordinary_final",
"junior_final",
"senior_final",
"suspended_final",
"bridge_gap"
]
},
"additionalProperties": {
"type": "object",
"required": [
"n",
"d"
],
"propertyNames": {
"enum": [
"n",
"d"
]
},
"additionalProperties": {
"type": [
"string",
"null"
],
"minLength": 1,
"maxLength": 64
}
}
}
},
"additionalProperties": false
}Published input example
{
"ordinary_n": 40,
"junior_n": 30,
"senior_n": 50,
"loss_share_n": 90,
"profit_share_n": 25,
"amount_denominator": 1,
"report": {
"ordinary_loss": {
"n": "40",
"d": "1"
},
"junior_loss": {
"n": "30",
"d": "1"
},
"senior_loss": {
"n": "20",
"d": "1"
},
"recognized_loss": {
"n": "90",
"d": "1"
},
"suspended_loss": {
"n": "0",
"d": "1"
},
"ordinary_after_loss": {
"n": "0",
"d": "1"
},
"junior_after_loss": {
"n": "0",
"d": "1"
},
"senior_after_loss": {
"n": "30",
"d": "1"
},
"profit_absorbed_suspended": {
"n": "0",
"d": "1"
},
"senior_recovery": {
"n": "20",
"d": "1"
},
"junior_recovery": {
"n": "5",
"d": "1"
},
"ordinary_recovery": {
"n": "0",
"d": "1"
},
"recognized_profit": {
"n": "25",
"d": "1"
},
"ordinary_final": {
"n": "0",
"d": "1"
},
"junior_final": {
"n": "5",
"d": "1"
},
"senior_final": {
"n": "50",
"d": "1"
},
"suspended_final": {
"n": "0",
"d": "1"
},
"bridge_gap": {
"n": "0",
"d": "1"
}
}
}Result & documentation
Machine-readable documentation of this hub
Source of this page: the published HALOWERK catalog. Updated: 2026-11-17 UTC.
More endpoints in this hub
- Finopswerk0.003 USDC
accumulating sick leave liability
POSThttps://finops.halowerk.com/v1/accumulating-sick-leave-liabilityMeasures one closing salary-only liability for non-vesting accumulating sick leave. For N identical employees with unused old carry C and next-year entitlement E (used first), the caller supplies three scenarios of future absence days a_j w
- Finopswerk0.003 USDC
acquisition goodwill nci bridge
POSThttps://finops.halowerk.com/v1/acquisition-goodwill-nci-bridgeReconstructs one acquisition-date business-combination goodwill/NCI bridge from caller-measured identified assets, assumed liabilities, cash and non-cash consideration and previously held interest. NCI mode 0 = proportionate identifiable ne
- Finopswerk0.003 USDC
adjusted coupon cashflow ledger
POSThttps://finops.halowerk.com/v1/adjusted-coupon-cashflow-ledgerFrom a civil start date, tenor, EOM, principal, rate and explicit calendars, derives unadjusted accrual anchors, Following/ModifiedFollowing/Preceding payment dates, ACT365F exact interest and the last principal redemption. Payment adjustme