Rechenwerk
feed in tariff
Uses the rates published by the Bundesnetzagentur (table VergSaetzeAug26bisDez26, chain from 2023-01-01, half-yearly 1 % degression under § 49 EEG 2023, rounded to two decimals): fixed feed-in tariff (anzulegender Wert minus 0.4 ct, § 53(1)) for buildings and noise barriers (§ 48(2)) in the brackets up to 10, 40 and 100 kW, full-feed-in values (§ 48(2a)), other installations (§ 48(1)) up to 100 kW, and the market-premium reference values up to 1 MW. The value is weighted by the share of.
POST https://rechen.halowerk.com/v1/feed-in-tariffInputs
| Field | Type | Required | Description |
|---|---|---|---|
| commissioning_date | string | Yes | Commissioning date (Inbetriebnahme). |
| installed_kwp | number | Yes | Installed capacity (kWp) incl. installations aggregated under § 24(1) EEG. |
| location | string | No | building = on/in a building or noise barrier (§ 48(2)); other = e.g. ground-mounted (§ 48(1)). |
| feed_in_mode | string | No | partial = surplus feed-in with self-consumption; full = full feed-in notified in advance (§ 48(2a), buildings only). |
| remuneration | string | No | feed_in_tariff (up to 100 kW, § 21) or market_premium reference value for direct marketing. |
| annual_feed_in_kwh | number | No | Expected annual feed-in (kWh) for an annual amount. |
Show full input schema
{
"type": "object",
"additionalProperties": false,
"required": [
"commissioning_date",
"installed_kwp"
],
"properties": {
"commissioning_date": {
"type": "string",
"format": "date",
"description": "Commissioning date (Inbetriebnahme)."
},
"installed_kwp": {
"type": "number",
"exclusiveMinimum": 0,
"maximum": 1000,
"description": "Installed capacity (kWp) incl. installations aggregated under § 24(1) EEG."
},
"location": {
"type": "string",
"enum": [
"building",
"other"
],
"default": "building",
"description": "building = on/in a building or noise barrier (§ 48(2)); other = e.g. ground-mounted (§ 48(1))."
},
"feed_in_mode": {
"type": "string",
"enum": [
"partial",
"full"
],
"default": "partial",
"description": "partial = surplus feed-in with self-consumption; full = full feed-in notified in advance (§ 48(2a), buildings only)."
},
"remuneration": {
"type": "string",
"enum": [
"feed_in_tariff",
"market_premium"
],
"default": "feed_in_tariff",
"description": "feed_in_tariff (up to 100 kW, § 21) or market_premium reference value for direct marketing."
},
"annual_feed_in_kwh": {
"type": "number",
"minimum": 0,
"maximum": 100000000,
"description": "Expected annual feed-in (kWh) for an annual amount."
}
}
}Published input example
{
"commissioning_date": "2026-09-15",
"installed_kwp": 9.8
}Result & documentation
Machine-readable documentation of this hub
Source of this page: the published HALOWERK catalog. Updated: 2026-11-17 UTC.
More endpoints in this hub
- Rechenwerk0.003 USDC
ai act risk class
POSThttps://rechen.halowerk.com/v1/ai-act-risk-classEvaluates the caller’s description against Regulation (EU) 2024/1689 as amended by Regulation (EU) 2026/1744: prohibited practices of Art. 5(1)(a)-(h) and the new points (ba) and (bb) (from 2 December 2026); high-risk under Art. 6(1) (safet
- Rechenwerk0.002 USDC
annuity schedule
POSThttps://rechen.halowerk.com/v1/annuity-scheduleMonthly annuity in arrears as used by German banks: rate = loan × (nominal rate + initial repayment rate) / 12, or from a term via A = L·q^n·(q−1)/(q^n−1) with q = 1 + i/12; interest each month = balance × i/12 (30/360), rounded to cents, t
- Rechenwerk0.002 USDC
appeal deadlines
POSThttps://rechen.halowerk.com/v1/appeal-deadlinesCovers only clearly codified periods: Berufung one month and grounds two months (§§ 517, 520(2) ZPO), Revision one and two months (§§ 548, 551(2) ZPO), labour court appeal (§ 66(1) ArbGG), all starting with service of the complete judgment