Ladewerk
ev depot edf power schedule
Return a bounded earliest-deadline-first depot charging schedule and unmet energy.
POST https://lade.halowerk.com/v1/ev-depot-edf-power-scheduleInputs
| Field | Type | Required | Description |
|---|---|---|---|
| slots | integer | Yes | |
| slot_minutes | number | Yes | |
| site_kw | number | Yes | |
| vehicles | array | Yes |
Show full input schema
{
"type": "object",
"properties": {
"slots": {
"type": "integer",
"minimum": 1,
"maximum": 96
},
"slot_minutes": {
"type": "number",
"minimum": 1,
"maximum": 1440
},
"site_kw": {
"type": "number",
"minimum": 0,
"maximum": 10000
},
"vehicles": {
"type": "array",
"items": {
"type": "object",
"properties": {
"id": {
"type": "string",
"maxLength": 48,
"minLength": 1
},
"release": {
"type": "integer",
"minimum": 0,
"maximum": 95
},
"deadline": {
"type": "integer",
"minimum": 1,
"maximum": 96
},
"need_kwh": {
"type": "number",
"minimum": 0,
"maximum": 1000000
},
"max_kw": {
"type": "number",
"minimum": 0,
"maximum": 10000
}
},
"required": [
"id",
"release",
"deadline",
"need_kwh",
"max_kw"
],
"additionalProperties": false
},
"maxItems": 50,
"minItems": 1
}
},
"required": [
"slots",
"slot_minutes",
"site_kw",
"vehicles"
],
"additionalProperties": false
}Published input example
{
"slots": 2,
"slot_minutes": 60,
"site_kw": 10,
"vehicles": [
{
"id": "A",
"release": 0,
"deadline": 1,
"need_kwh": 10,
"max_kw": 10
},
{
"id": "B",
"release": 0,
"deadline": 2,
"need_kwh": 10,
"max_kw": 10
}
]
}Result & documentation
Machine-readable documentation of this hub
Source of this page: the published HALOWERK catalog. Updated: 2026-11-18 UTC.
More endpoints in this hub
- Ladewerk0.003 USDC
detail
POSThttps://lade.halowerk.com/v1/detailOSM object identifier node/123, way/123 or relation/123: connector types, battery locker, capacity, opening hours, fees, operator, access, raw tags, modification date and source data snapshot. Unrecorded details remain null. No live availab
- Ladewerk0.005 USDC
ev charge phase assignment
POSThttps://lade.halowerk.com/v1/ev-charge-phase-assignmentReturn a largest-load-first single-phase assignment around declared fixed charger phases.
- Ladewerk0.005 USDC
ev charge site sharing replay
POSThttps://lade.halowerk.com/v1/ev-charge-site-sharing-replayReturn max-min fair site power sharing under declared per-vehicle caps for each slot.