Finopswerk
concessional government loan grant bridge
Reconstructs one borrower government zero-coupon concessional loan with its linked income-related grant. Face P is received at the start of year 1 and repaid at the end of year 2. With a caller-qualified comparable market EIR r, initial loan FV=P/(1+r)^2 and the below-market benefit G=P-FV is recognized as deferred government-grant income, not equity. The grant is released in proportion G*Ej/(E1+E2) to two given eligible operating costs E1/E2.
POST https://finops.halowerk.com/v1/concessional-government-loan-grant-bridgeInputs
| Field | Type | Required | Description |
|---|---|---|---|
| face_n | integer | Yes | |
| market_rate_bp | integer | Yes | |
| compensated_costs_n | array | Yes | |
| amount_denominator | integer | Yes | |
| report | object | Yes |
Show full input schema
{
"type": "object",
"required": [
"face_n",
"market_rate_bp",
"compensated_costs_n",
"amount_denominator",
"report"
],
"properties": {
"face_n": {
"type": "integer",
"minimum": 1,
"maximum": 1000000
},
"market_rate_bp": {
"type": "integer",
"minimum": 1,
"maximum": 10000
},
"compensated_costs_n": {
"type": "array",
"items": {
"type": "integer",
"minimum": 0,
"maximum": 1000000
},
"minItems": 2,
"maxItems": 2
},
"amount_denominator": {
"type": "integer",
"minimum": 1,
"maximum": 1000
},
"report": {
"type": "object",
"minProperties": 24,
"maxProperties": 24,
"propertyNames": {
"enum": [
"loan_face",
"market_rate",
"loan_initial_FV",
"initial_grant",
"loan_interest1",
"loan_close1",
"loan_interest2",
"loan_prematurity",
"loan_repayment",
"loan_final",
"grant_income1",
"grant_income2",
"deferred_grant_close1",
"deferred_grant_final",
"funding_PL1",
"funding_PL2",
"total_interest",
"total_grant_income",
"total_funding_PL",
"combined_liability_close1",
"initial_split_gap",
"final_liability_gap",
"interest_grant_gap",
"net_funding_cash"
]
},
"additionalProperties": {
"type": "object",
"required": [
"n",
"d"
],
"propertyNames": {
"enum": [
"n",
"d"
]
},
"additionalProperties": {
"type": [
"string",
"null"
],
"minLength": 1,
"maxLength": 64
}
}
}
},
"additionalProperties": false
}Published input example
{
"face_n": 121,
"market_rate_bp": 1000,
"compensated_costs_n": [
100,
200
],
"amount_denominator": 1,
"report": {
"loan_face": {
"n": "121",
"d": "1"
},
"market_rate": {
"n": "1",
"d": "10"
},
"loan_initial_FV": {
"n": "100",
"d": "1"
},
"initial_grant": {
"n": "21",
"d": "1"
},
"loan_interest1": {
"n": "10",
"d": "1"
},
"loan_close1": {
"n": "110",
"d": "1"
},
"loan_interest2": {
"n": "11",
"d": "1"
},
"loan_prematurity": {
"n": "121",
"d": "1"
},
"loan_repayment": {
"n": "121",
"d": "1"
},
"loan_final": {
"n": "0",
"d": "1"
},
"grant_income1": {
"n": "7",
"d": "1"
},
"grant_income2": {
"n": "14",
"d": "1"
},
"deferred_grant_close1": {
"n": "14",
"d": "1"
},
"deferred_grant_final": {
"n": "0",
"d": "1"
},
"funding_PL1": {
"n": "-3",
"d": "1"
},
"funding_PL2": {
"n": "3",
"d": "1"
},
"total_interest": {
"n": "21",
"d": "1"
},
"total_grant_income": {
"n": "21",
"d": "1"
},
"total_funding_PL": {
"n": "0",
"d": "1"
},
"combined_liability_close1": {
"n": "124",
"d": "1"
},
"initial_split_gap": {
"n": "0",
"d": "1"
},
"final_liability_gap": {
"n": "0",
"d": "1"
},
"interest_grant_gap": {
"n": "0",
"d": "1"
},
"net_funding_cash": {
"n": "0",
"d": "1"
}
}
}Result & documentation
Machine-readable documentation of this hub
Source of this page: the published HALOWERK catalog. Updated: 2026-11-17 UTC.
More endpoints in this hub
- Finopswerk0.003 USDC
accumulating sick leave liability
POSThttps://finops.halowerk.com/v1/accumulating-sick-leave-liabilityMeasures one closing salary-only liability for non-vesting accumulating sick leave. For N identical employees with unused old carry C and next-year entitlement E (used first), the caller supplies three scenarios of future absence days a_j w
- Finopswerk0.003 USDC
acquisition goodwill nci bridge
POSThttps://finops.halowerk.com/v1/acquisition-goodwill-nci-bridgeReconstructs one acquisition-date business-combination goodwill/NCI bridge from caller-measured identified assets, assumed liabilities, cash and non-cash consideration and previously held interest. NCI mode 0 = proportionate identifiable ne
- Finopswerk0.003 USDC
adjusted coupon cashflow ledger
POSThttps://finops.halowerk.com/v1/adjusted-coupon-cashflow-ledgerFrom a civil start date, tenor, EOM, principal, rate and explicit calendars, derives unadjusted accrual anchors, Following/ModifiedFollowing/Preceding payment dates, ACT365F exact interest and the last principal redemption. Payment adjustme